锌冶炼过程中浸渣加压还原酸浸除铁工艺优化
杨明学1, 罗庆教1, 楚立军1, 尹延西2,3,4
(1. 南丹县南方有色金属有限责任公司;2. 有研资源环境技术研究院(北京)有限公司;3. 高品质有色金属绿色特种冶金国家工程研究中心;4. 战略性有色金属绿色制造技术北京市工程研究中心)
Process Optimization of Iron Removal by Pressure Reduction Acid Leaching of Residue in Hydrometallurgical Zinc
摘要
图/表
参考文献
本刊相似文献
All Journals 相似文献
All Journals 引证文献
本文已被:浏览 1536次   下载 1667
投稿时间:2023-06-29    修订日期:2023-07-28
中文摘要: 铁是金属锌产品中主要的杂质元素之一,如何去除是目前锌冶炼生产过程亟须解决的技术难题,湿法锌冶炼中如何除铁已开展了很多研究。介绍了工业上常用的几种湿法锌冶炼工艺流程以及常用的除铁方法,分析了黄钾铁矾法、针铁矿法、赤铁矿法和氧压浸出法等除铁方法的工艺特点以及相应的产品指标,并开展了锌中浸渣加压还原酸浸除铁工艺研究。结果表明:在高温高压条件下,可以同时进行浸锌沉铁,使铁以赤铁矿渣的形式沉淀,达到了浸锌除铁的目的,不需单独设计除铁工序,酸浸液中铁可低于4 g/L,酸度40~50 g/L H2SO4,利用沸腾焙烧炉产出的SO2烟气作为还原剂通入高压釜前段将溶液中Fe3+还原为Fe2+, Fe3+还原率高达94%,将O2通入高压釜中段,对锌中浸渣进行加压酸浸,锌还原浸出率可高达90%。该工艺可以有效解决除铁工艺工序长、设备多、投资大、操作复杂等问题,实现了缩短流程、简化设备、方便操作以及高效安全的生产目的。
中文关键词: 锌冶炼  浸渣加压  氧化还原  除铁
Abstract:Iron is one of the main impurity elements in metal zinc products, and it is also a technical problem that needs to be solved urgently in zinc smelting production process. Many studies have been carried out on how to remove iron in zinc hydrometallurgy. In this paper, several zinc hydrometallurgy processes and iron removal methods used in industry were introduced, and the characteristics of iron removal technologies of jarosite process, goethite process, hematite process and oxygen pressure leaching process were analyzed,as well as the product indexes of the corresponding processes, and the iron removal process of zinc neutral leaching residue by pressure reductive acid leaching was studied. The results showed that the iron could be precipitated in the form of hematite slag under the condition of high temperature and high pressure, and the purpose of zinc leaching and iron removal could be achieved without a separate iron removal process, the iron content in the acid leaching solution could be lower than 4 g/L, and the acidity of H2SO4 was 40~50 g/L. The SO2 flue gas produced by the fluidized roaster was used as a reducing agent to be introduced into the front section of the autoclave to reduce Fe3+ in the solution to Fe2+ and the reduction rate of Fe3+ was as high as 94%. O2 was introduced into the middle section of the autoclave to carry out pressure acid leaching on the zinc neutral leaching residue, and the reduction leaching rate of zinc could be as high as 90%. The process could effectively solve the following problems: such as long iron removal process, more equipment, large investment, complex operation etc., and achieve the production purposes of short flow, simplified equipment, convenient operation, high efficiency and safety.