中文摘要: 随着贵冶铜产量不断提升,各种地方矿、集装箱进口矿的用量也在不断增加。因卸车能力受限,入厂的集装箱进口矿和地方矿不能同时卸车,从而出现滞箱现象。为满足集装箱进口矿和地方矿卸车要求,在现备料二系统精矿库 2# 仓区域,增设专门用于集装箱进口矿的卸料平台,并在 3# 精矿库东侧新建雨棚,满足雨天卸料作业要求。
Abstract:With the continuous increase of copper production in Guiye Smelter, the consumption of various local concentrates and container imported concentrates is also increasing. Due to the limited unloading capacity, the imported container concentrates and local concentrates cannot be unloaded at the same time, resulting in container demurrage phenomenon and high demurrage costs. In order to meet the requirements of container imported and local concentrates unloading, a special unloading platform for imported concentrates is added in the No.2 warehouse area of the current material preparation system II, and a new canopy is built on the east side of warehouse 3# to meet the requirements of unloading operation in rainy days.
文章编号:20210319 中图分类号:F252.13
基金项目:
引用文本:
宋荣荣.集装箱卸料平台的应用与实践[J].铜业工程,2021,(3):77-78