中文摘要:
Abstract:The low-pressure steam in Guixi Smelter is mainly used for recovery and utilization of waste heat from smelting workshop flash furnace and converter blowing. Due to the fluctuation of main process production, with the rise of temperature, one steam vent valve action occurred in the factory for many times, resulting in waste of steam empting, and the shortage of production cost increased by purchasing steam from power plant. The causes of the above phenomena are analyzed systematically, and effective optimization schemes are put forward for the existing deficiencies.
keywords: steam outsourcing vent valve action steam emptying optimization the desulfurization with steam
文章编号:20210424 中图分类号:TF808
基金项目:
引用文本:
张巍.贵冶低压蒸汽管网系统优化[J].铜业工程,2021,(4):94-97